Demolition scopes are often underestimated because they require reading existing condition drawings — not just demo plans — to understand what is actually being removed. We quantify every selective demo item, concrete removal, and structure removal from the drawings so your demo bid reflects the actual scope.
Full scope
Selective + structural
24–48 hr
Turnaround
All trades
MEP + civil
±2%
Accuracy target
Who needs this
Demolition contractors, GCs with self-perform demo scope, and tenant improvement contractors needing selective demo quantities before subcontractor pricing.
Every quantity below is pulled digitally from the drawings — no rule-of-thumb assumptions.
01Structural Removal
02Selective Interior Demo
03MEP & Hazmat
Common sources of error in demolition estimating scopes — and what we check.
01
Existing condition drawings outdated or unavailable
02
Selective demo scope vs. full removal unclear
03
Hazmat abatement scope not separated in bid
04
Demo phasing requiring staged quantities
We have done demolition estimating for these project categories.
Four steps from drawings to quantities — typical turnaround 24–48 hours.
Step 01
Upload your plan set through our contact form. Include the scope notes and bid date.
Step 02
We review the drawings, confirm scope, and send back a brief before starting.
Step 03
We measure every demolition element using digital takeoff software against your drawings.
Step 04
You receive an Excel workbook and PDF export with all quantities organized by element type.
Send a set of drawings today and receive a bid-ready estimate — accurate, local, and on time. No subscription. No retainer. Just results.