Framing takeoffs are time-consuming because every wall, floor, and roof assembly has its own member spacing, height, and species requirement. We produce detailed lumber lists and metal framing counts that your supplier can quote directly — no back-of-envelope conversions needed.
LF exact
Every member
24–48 hr
Turnaround
Wood + steel
Both framing types
±2%
Accuracy target
Who needs this
Framing contractors, home builders needing supplier-ready material lists, and GCs verifying framing sub pricing on wood-frame or light-gauge steel projects.
Every quantity below is pulled digitally from the drawings — no rule-of-thumb assumptions.
01Wood Framing
02Sheathing & Panels
03Light-Gauge Steel
Common sources of error in framing estimating scopes — and what we check.
01
Lumber lists that don't match actual member counts
02
Engineered wood products missed or undersized
03
Sheathing waste factors not accounted for
04
Metal framing gauge inconsistencies across drawings
We have done framing estimating for these project categories.
Four steps from drawings to quantities — typical turnaround 24–48 hours.
Step 01
Upload your plan set through our contact form. Include the scope notes and bid date.
Step 02
We review the drawings, confirm scope, and send back a brief before starting.
Step 03
We measure every framing element using digital takeoff software against your drawings.
Step 04
You receive an Excel workbook and PDF export with all quantities organized by element type.
Send a set of drawings today and receive a bid-ready estimate — accurate, local, and on time. No subscription. No retainer. Just results.