Electrical plan sets are dense — fixture schedules, panel schedules, single-line diagrams, and detail sheets that must all be reconciled against the architectural floor plans. Misreads are common and expensive. We pull quantities from every relevant sheet so your electrical estimate is built on complete counts.
All sheets
Reconciled
24–48 hr
Turnaround
Div 26
Full coverage
±2%
Accuracy target
Who needs this
Electrical contractors bidding commercial, industrial, or multi-family projects, and GCs verifying electrical sub pricing or building owner-estimate comparisons.
Every quantity below is pulled digitally from the drawings — no rule-of-thumb assumptions.
01Distribution & Panels
02Devices & Fixtures
03Gear & Specialty
Common sources of error in electrical estimating scopes — and what we check.
01
Fixture schedules not matching floor plan callouts
02
Conduit runs spanning multiple drawing sheets
03
Panel schedules missing or in early revision
04
Low-voltage scope unclear on architectural drawings
We have done electrical estimating for these project categories.
Four steps from drawings to quantities — typical turnaround 24–48 hours.
Step 01
Upload your plan set through our contact form. Include the scope notes and bid date.
Step 02
We review the drawings, confirm scope, and send back a brief before starting.
Step 03
We measure every electrical element using digital takeoff software against your drawings.
Step 04
You receive an Excel workbook and PDF export with all quantities organized by element type.
Send a set of drawings today and receive a bid-ready estimate — accurate, local, and on time. No subscription. No retainer. Just results.