Masonry estimating requires counting every block, every brick, and every bag of mortar — then accounting for bond patterns, coursing heights, openings, and reinforcing. A rough SF estimate leaves too much on the table. We count it all so your masonry bid reflects actual material quantities.
Unit
Level accuracy
24–48 hr
Turnaround
All CMU
Sizes covered
±2%
Accuracy target
Who needs this
Masonry subcontractors bidding CMU, brick, or stone scopes, and general contractors self-performing masonry or verifying sub pricing.
Every quantity below is pulled digitally from the drawings — no rule-of-thumb assumptions.
01CMU Block
02Brick & Veneer
03Grout, Mortar & Reinforcing
Common sources of error in masonry takeoff scopes — and what we check.
01
Openings miscounted or improperly deducted
02
Bond patterns changing between elevations
03
Specialty units overlooked in standard counts
04
Grout fill patterns inconsistently applied
We have done masonry takeoff for these project categories.
Four steps from drawings to quantities — typical turnaround 24–48 hours.
Step 01
Upload your plan set through our contact form. Include the scope notes and bid date.
Step 02
We review the drawings, confirm scope, and send back a brief before starting.
Step 03
We measure every masonry element using digital takeoff software against your drawings.
Step 04
You receive an Excel workbook and PDF export with all quantities organized by element type.
Send a set of drawings today and receive a bid-ready estimate — accurate, local, and on time. No subscription. No retainer. Just results.